NCS was contracted to provide remedial repair to a newly constructed sewerage
treatment tank. Cold joint repairs were conducted to the inside and outside of the tank, restoring the concrete back to original contour.
The repair method required the affected area to be scabbled and Xypex Megamix II applied, ensuring
long-term concrete waterproofing and durability. |